Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

6 articles tagged #Annex1.

Material airlock hold time: a dilution sum

At 20 air changes an hour, a material airlock needs about 14 minutes for a 100:1 particle drop after the outer door closes. The interlock needs a hold-open timer and alarm for trolleys, and the countdown should start at door closure. The gowning airlock is laid out around people instead.

InsightRead

Pressure taps and tubing that tell the truth

A 3 m/s supply jet near a pressure tap can shift the reading by up to about 5 Pa, down or up depending on its angle, which is a third to half of a 10–15 Pa cascade. Tap position, tubing without low loops, matched tube lengths and a still reference port decide whether a room pressure trend is trustworthy.

InsightRead

What a smoke study proves, and what it does not

Airflow visualization shows flow patterns over the critical zone, direction at openings and the effect of interventions. It does not show particle levels, filter integrity, velocity or microbial control, and a study filmed at rest says little about operation. Plan interventions and acceptance criteria first.

Read

A 10–15 Pa differential between grades exists only while the door is shut. Once it opens, door swing, the operator's wake and any temperature difference between rooms drive air both ways. Holding adjacent rooms at the same temperature, keeping door-open time short and interlocking airlocks keep the exchange small.

Read