The smoke leaves the filter, sweeps past the filling needles and out under the barrier, and everyone watching nods.
The video has proved less than the nodding suggests. Airflow visualization is persuasive, and easy to over-read.
What a well-run smoke study does show:
- The airflow pattern over the critical zone: unidirectional flow reaching exposed product without turbulence or reverse flow.
- That air moves from clean to less clean at openings, barrier doors and mouse holes.
- How interventions disturb the flow, if operators perform them during the study with the real equipment in place.
What it does not show:
- Particle levels or filter integrity. A tidy pattern can sit under a leaking filter; that is what the installed leak test and classification are for.
- Velocity. Smoke shows direction, not whether the flow meets its specified velocity.
- Microbial control, cleaning effectiveness or gowning discipline.
- In-operation behaviour, if the study was filmed at rest with the line empty.
Annex 1 (2022) asks for airflow pattern studies both at rest and in operation, with operator interventions simulated. The value comes from planning: which interventions, which camera angles and which acceptance criteria, agreed before the smoke generator is switched on.
Who agreed the intervention list for your last smoke study?