Skip to content

Life Sciences

30 °C / 75% RH: what Zone IVb asks of a stability chamber

  • Life Sciences
  • 1 min read

30 °C and 75% RH, for years, through door openings, power dips and the odd compressor failure: the brief for an ASEAN stability chamber.

The condition belongs to Climatic Zone IVb, hot and very humid. The ASEAN stability guideline names it as the general long-term condition for the region: 30 °C ± 2 °C and 75% RH ± 5% RH for products in containers that are semi-permeable to water vapour.

Those tolerances are the chamber's specification, and mapping shows whether they hold where the samples sit.

The guideline also covers lapses. Short-term spikes from opening the doors are accepted as unavoidable. The effect of an excursion caused by equipment failure should be addressed, and excursions beyond the tolerances for more than 24 hours should be described in the study report and their effect assessed.

Read from the plant room, that paragraph is a specification. The monitoring record has to show when each excursion began and ended, from a probe independent of the controller, with an alarm that reaches someone at night. And the chamber needs a way back inside 24 hours: a standby refrigeration circuit and power from the essential board.

The mapping reports and the alarm history become part of the stability evidence.

How long does your chamber take to return inside ±2 °C and ±5% RH after a compressor trip?

Industries

Related

More on this subject

A saturated sodium chloride slurry in a sealed container holds the air above it at about 75% RH at 25 °C; magnesium chloride gives about 33%. The two points show whether a humidity probe has drifted between calibrations. It is a field check and does not replace a traceable calibration.

InsightRead

A BMS setpoint edit is a GMP change

Moving a room pressure setpoint from 15 Pa to 12 Pa changes nothing physical and still changes a qualified parameter. Annex 15 section 11 and Annex 11 put it under change control: raise it, assess the cascade and the CCS, decide on retest, then edit. Lock qualified setpoints behind a controlled role.

InsightRead