A qualification report ends with a release decision

  • Life Sciences
  • 1 min read

The last page of a qualification report should let someone who never saw the tests decide whether the system moves on.

Many are just the executed protocol with a cover sheet, three hundred pages of ticks and signatures, and a final line reading "OQ completed". The reader still has to work out whether it passed, what went wrong along the way, and who agreed it could proceed.

EU GMP Annex 15 asks the report to cross-reference the protocol, summarise the results, comment on deviations, draw conclusions, and formally release the system for the next step. In practice the summary should cover:

  1. Which protocol, which version, and which system boundary it covered.
  2. The results against each acceptance criterion, in a table a reader can scan.
  3. Every deviation, its root cause, and what it did to the result. Closed, or carried forward with a justification and an owner.
  4. A conclusion in plain words: fit for the next stage, fit with conditions, or not fit, with any conditions listed.
  5. The release, signed and dated by the responsible personnel your quality system names, before the next protocol is executed.

Writing "fit with conditions" commits the author to listing the conditions and giving each one an owner, which is why so many summaries settle for "completed".

Our EPCM work runs stage gates from concept to PQ, with DQ, IQ, OQ and PQ inside them.

More compliance and CQV notes

Industries

Related

More on this subject

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead

A month-end note from Tony Nguyen, CEO

After more than twenty years with automation vendors and running an EU-GMP EPC contractor, Tony Nguyen saw problems start at the handovers between companies rather than inside any one scope. This note explains why Humiley is organized as one accountable team across design, project management, equipment and maintenance.

InsightRead

A technology transfer package needs the reasons with the recipe

A batch record followed to the letter does not tell a receiving site why each parameter sits where it does. The WHO guideline on technology transfer says the sending unit should make available all the necessary information and knowledge. Check for the development history, the justified control strategy, validated analytical procedures with stability data, and hold time and cleaning information.

InsightRead