Following a batch record to the letter does not tell a receiving site why the drying stops where it does.
A transfer that ships only the recipe works until something differs: a granulator with another bowl geometry, an excipient from a new supplier. Then someone has to know which parameters can move, and the people who know are at the other site.
WHO TRS 1044, Annex 4, the technology transfer guideline, says the sending unit should make available all the necessary information and knowledge on the product, process or procedure. Its lists are long. Ask at kick-off for:
- The development report, with the history of the process and its changes.
- The master formula and executed batch records, with scale-up information.
- The control strategy with its justification: quality attributes, critical process parameters and the ranges that were qualified.
- Analytical procedures with their validation reports, and the stability data.
- Hold time studies, and cleaning information with solubility, cleanability and health-based exposure limits.
The batch records and methods nearly always arrive. The development history and the reasons behind the control strategy tend to arrive as a summary.
Our EU-GMP roadmap consulting covers QMS, CTD/eCTD dossier, technology transfer, MAH, QP and pharmacovigilance.
At your sending site, is the person who set the drying end-point still there to ask?