Pure steam can meet WFI quality as condensate and still fail at the steriliser.
Chemistry is one test. EN 285 adds three physical ones, and each fails for a different reason in the pipework.
Dryness value of at least 0.95 (0.90 for metal loads). Wet steam carries water droplets that soak wrapped loads and insulate surfaces from the heat. The usual causes are missing or undersized trap stations, long uninsulated runs, and branch take-offs from the bottom of the header instead of the top.
Non-condensable gases no more than 3.5 ml per 100 ml of condensate, written as 3.5%. Air and other gases form a layer on the load that steam cannot get through. Look at feedwater degassing, air ingress at fittings running under vacuum after shutdown, and air vents that were never installed at the high points.
Superheat no more than 25 K on expansion to atmospheric pressure. Superheated steam behaves like hot air and sterilises badly. It usually comes from a large pressure drop across a reducing valve close to the point of use.
So one failed sample does not tell you what to fix until you know which of the three it failed. A generator that passes at the outlet can still fail at a use point 40 metres away if the distribution is the problem.
We design pure steam distribution with those three causes on the drawing: trap spacing, venting and where the pressure is reduced.