A 2–8 °C cold room alarm with no delay goes off at every delivery, and after a month nobody reads it.
Opening the door for a pallet lifts the air temperature near the door within a minute or two. Product in cartons at the back barely moves. If the monitoring probe sits by the door and the alarm fires the moment it passes 8 °C, the log fills with delivery spikes. Operators acknowledge by habit, including the one excursion that matters.
The mapping study can fix this if it is planned for it. Run it long enough to capture at least one defrost cycle and one real delivery, empty and loaded, in both the wet season and the dry season. Then read two things from the data. Where is the room warmest and coldest in the product zone with the door shut? And how long does a door-open peak last before the air comes back?
The first answer tells you where the routine monitoring probe belongs: at the mapped worst point where product actually sits. The second gives you an alarm delay you can explain to an inspector, one that a normal delivery rides through and a door left open does not.
The EU GDP Guidelines (2013) ask for mapping and alarms but set no delay value, so the justification comes from your own data. Humiley's maintenance service includes periodic requalification and calibration, which is when that delay should be rechecked.
Topics
Industries