The BMS passes room pressure to the EMS over a network link. On many sites nobody has tested what the EMS stores when it drops.
Some systems hold the last good value and keep logging it. The trend stays flat at 15 Pa for two hours, the batch record shows a room in limits, and the data is wrong in a very convincing way.
EU GMP Annex 11 has one sentence on this, under the heading "Data". The 2011 text of Annex 11 (clause 5) says computerized systems that exchange data electronically with other systems should include appropriate built-in checks for the correct and secure entry and processing of data. For critical systems, the same 2011 text (clause 4.3) says an up-to-date system description covering data flows and interfaces with other systems should be available.
The annex does not list the checks. On a BMS-to-EMS link, our reading starts with a quality or status flag on every exchanged value, so that the receiving system stores "bad" or a gap when the flag is bad and never stores the last number as if it were new. A watchdog or heartbeat detects loss of communication within a defined time and raises an alarm that someone has to acknowledge. Units, scaling and time stamps are checked end to end: 15 Pa at the transmitter is 15 Pa in the report, with the time of the measurement. And the interface test goes into the qualification, with the cable pulled and the stored data reviewed afterwards.
Industries




