What to find on every page of a controlled document

  • Life Sciences
  • 1 min read

Page 4 of a cleaning SOP is taped beside a machine, with no document number and no version on it.

The binder in the office is at version 6. Nobody on the floor can say which version that page came from, and an inspector who notices it does not need to read the procedure to write the observation.

The 2011 text of EU GMP Chapter 4 says documents should be uniquely identifiable, that documents containing instructions should be approved, signed and dated by appropriate and authorised persons, and that the effective date should be defined. For a single sheet, most sites make that work with four things on every page:

  1. Document number and title, so a loose page can be traced.
  2. Version number and effective date.
  3. Page x of y, so a missing page shows.
  4. A controlled-copy mark, so a stray print can be told from an issued copy.

The layout is site practice; the chapter does not prescribe one. Signatures and change history stand once per document, and the page's number and version lead back to them.

The gaps turn up outside the document system: forms, logbooks, drawings, and the laminated one-page summaries that operators make for themselves.

Topics

Industries

Related

More on this subject

When the EMS server fails mid-fill

EU GMP Annex 11 (2011) clause 16 expects documented, tested continuity arrangements for systems supporting critical processes. For an environmental monitoring system that means knowing whether counters buffer and back-fill, who takes manual readings, who decides to stop a fill and how quickly the server can be restored.

InsightRead

When the root cause is 'human error' and the action is retraining

A deviation closed as human error with retraining tends to return, because what made the slip easy is still there. The 2013 text of EU GMP Chapter 1 says human error as a cause should be justified, with system causes not overlooked. Change the form, the label or the step, then check for recurrence.

InsightRead

Where the 30-day deviation deadline comes from

The 2013 text of EU GMP Chapter 1 and 21 CFR 211.192 speak of recording and investigating deviations, and neither gives a number of days. The 30-day limit is the site's own, and inspectors hold a site to its procedure. The alternative is also a site rule: a limit per risk class, with extensions only on a written reason and an interim risk assessment.

InsightRead