Records to hold before loading a stability chamber

  • Life Sciences
  • 1 min read

Stability samples for a product spend three years inside one chamber, on one compressor and one control loop.

The ICH stability guideline, Q1A(R2), writes each storage condition with a tolerance, for example 25 °C ± 2 °C and 60% RH ± 5% RH. It says the equipment should be capable of controlling the condition within those ranges, and that excursions beyond tolerance for more than 24 hours should be described in the study report.

Whether a chamber can do that is a qualification question, through the stages EU GMP Annex 15 (2015) sets out. Neither text lists the tests, so these are the five records we would ask to see before the first sample goes in:

  1. A mapping report for each setpoint in use, empty and at a realistic load.
  2. A monitoring probe independent of the control sensor, with an alarm that reaches a person on duty.
  3. Recovery times after a door opening and after a power cut. Q1A(R2) accepts short spikes from opening doors as unavoidable; the record shows how short yours are.
  4. A written backup plan: which chamber takes the samples if this one fails.
  5. Calibration certificates for both sensors, temperature and humidity, at the setpoints in use.

Point 4 tends to get written after the first failure. A compressor stops on a holiday weekend, and the 24 hours pass before anyone finds a chamber with room for the samples.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Industries

Related

More on this subject

CTD Module 3 describes the plant you are building

The CTD has five modules, and Module 3 (Quality) records the process, its controls and often the facility, including room grades, water grades and the conditions behind hold times. After approval, changing them generally needs a variation. Draft Module 3 and the design basis from one table and send every change to both teams.

InsightRead

Engineering's part of the product quality review

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead