Pinholes in isolator gloves are invisible from arm's length and large enough to breach the barrier they belong to.
Gloves are the weakest part of a RABS or an isolator. They flex and stretch all shift, rub on edges, and meet tools and stopper bowls. Annex 1 (2022) treats them as part of the barrier and expects two kinds of check.
The visual check happens every time the glove is used. It finds tears, discolouration and swelling. It misses pinholes.
The physical integrity test is usually pressure decay: the glove port is sealed and pressurised, and the fall in pressure over a set time is compared with a limit. For isolators, Annex 1 expects it at defined frequencies, at a minimum at the start and end of each batch or campaign. Check the exact wording for your barrier type before it goes into an SOP.
The hard part is deciding in advance what a failure means. If a glove fails at the end of a batch, every intervention through that port since the last pass is in question. The SOP should say who assesses the batch, which records they pull (intervention log, EM results at that port, the glove's change history) and when the glove and cuff are replaced.
Humiley designs sterile fill-finish suites with the Contamination Control Strategy as the organizing document, and glove testing sits inside it.
Industries




