Block walls with epoxy paint are the cheapest way to build a GMP room, right up to the first time the room has to change.
Take a Grade C room a few years after handover that needs a new sensor line and a pipe for a second machine. In masonry that means core drilling inside a classified area, dust sheets, patching and repainting, then a clean and a particle count before production can come back. All of it goes through change control, and the room is out of use until the paint has cured.
Panels make that a smaller job. Services can run in a prepared cavity, the face is finished in the factory, and a new penetration is a sealed gland in a panel instead of patched plaster. The price is a higher first cost, plus a wall base that needs protecting from trolleys.
Masonry also has a slow cost: the painted wall-to-slab joint cracks as the building settles, and cleaning agents cannot reach into a cracked cove.
One test helps before you choose. In your existing plant, count how often each type of room changed layout or services over the last 5 years. Filling suites and rooms that get new equipment at every product change often changed more than once, and those usually repay panels. A support corridor that has not moved since handover can stay block and paint.
Cleanroom panels, doors, modular walls and ceilings are part of our AeroSano range, built by qualified manufacturing partners under Humiley engineering control.
Topics
Industries




