ISO 16890 pre-filters and the HEPA behind them

  • Manufacturing & Distribution
  • 1 min read

A pre-filter's grade decides how often you pay for the HEPA downstream of it. ISO 16890 gives it three names that are easy to mix up.

ISO 16890 rates filters by the fraction of particulate matter they remove in three size ranges: ePM10 (particles 0.3–10 µm), ePM2.5 (0.3–2.5 µm) and ePM1 (0.3–1 µm). To be classified in a group, a filter has to remove at least 50% of that fraction; for ePM1 and ePM2.5 the discharged (minimum) efficiency must also reach 50%. A filter below 50% on ePM10 is rated ISO Coarse. The rating reads as a group and a percentage, for example ePM1 70%.

Where each typically sits in a GMP air handling unit:

  1. First stage on fresh air: a coarse or ePM10 filter that takes the heavy dust and insects and loads fastest.
  2. Second stage, before the coil and fan: an ePM2.5 or ePM1 filter that keeps fine dust off the coil and off the final stage.
  3. Final stage: H13 or H14 to EN 1822, at the terminal or in the unit.

A cheaper, lower second stage saves money at every change, then spends it on HEPA filters that load sooner and cost far more to replace and leak-test. Going higher has its own bill: more pressure drop, and so more fan energy, every hour the unit runs.

AeroSano units are engineered from the project's own airflow schedule and load calculation, and the filter train is part of that choice rather than a catalogue default.

What pre-filter grade sits in front of your terminal HEPAs?

Industries

Related

More on this subject

Periodic and event-driven requalification

A new AHU on a running suite moves the pressure cascade, so its event-driven requalification reaches the differential at every door it serves. Change control sets that scope. Annex 1 (2022) separately caps periodic cleanroom intervals at 6 months for Grade A and B and 12 for C and D.

InsightRead

Periodic requalification: what is retested and how often

EU GMP Annex 1 (2022) sets maximum requalification intervals: 6 months for Grade A and B cleanrooms and 12 months for Grade C and D. Classification, HEPA leak tests, airflow volume, pressure differentials and air velocity, or recovery where airflow is not unidirectional, are retested. A risk assessment can shorten these intervals, never extend them.

InsightRead