Skip to content

Life Sciences

Hold time: the wait, the container and the room

  • Life Sciences
  • 1 min read

Granules dried on Friday sit in a bin until Monday, and the batch record is silent on whether they may.

Hold time is the term for that wait. WHO's guidance on hold-time studies (TRS 992, Annex 4) describes it as the established time period for which materials may be held under specified conditions and will remain within the defined specifications. It says maximum acceptable holding periods should be established, and that normally intermediate and bulk products should not be stored beyond the established hold time.

The same text ties "specified conditions" down: the hold period should be established with the material in the original container used in production or a simulated one, and the environmental conditions for the study samples should be the same as those of the quarantine area or manufacturing stage. So "dried granules, 30 days" really means 30 days in this bin, with this liner, in a room at this temperature and humidity.

If the samples sat at 25 °C and 50% RH while the bins wait in a corridor that reaches 30 °C and 70% RH in the rainy season, the study does not describe the wait. The room's temperature and humidity record is what shows it.

Industries

Related

More on this subject

Batch records and the room data behind them

Under EU GMP Chapter 4, paragraph 4.11, a product with a 5-year shelf life keeps its batch documentation for at least 6 years. Environmental and BMS data that supported release is safest kept for the same period, so historian retention and storage belong in the URS for the BMS and EMS.

InsightRead