Product-contact compressed air and nitrogen in a semi-solids plant

  • Life Sciences
  • 1 min read

In a cream line, the gas that drives a product pig or pressure-transfers a batch between vessels touches the product on every run.

Semi-solids plants use a lot of it. Compressed air or nitrogen pushes product out of transfer lines behind a pig, blankets oxygen-sensitive bulk in a holding vessel and purges tube fillers. Each of those points needs a stated quality, and ISO 8573-1 gives the language: one class for particles, one for water as pressure dew point, one for total oil, written as three numbers.

The class belongs to the use point, not to the plant. Instrument air for valve actuators and gas blown onto product do not need the same specification, and holding the whole network to the stricter one is usually money spent for nothing.

Where the sample is taken matters as much as the class. A test at the compressor outlet proves the compressor. The product meets the gas after the dryer, the distribution pipework and the final filter, so that is where it is sampled. Viable microorganisms are tested too, and ISO 8573-7 gives the method.

Nitrogen from an on-site generator starts as compressed air. It gets the same treatment: a class per use point, sampled after the final filter.

Our engineering scope covers clean utilities and process piping with the HVAC, and product-contact gases belong in the same qualification plan.

Which use points in your plant have a stated ISO 8573-1 class?

Industries

Related

More on this subject

Engineering's part of the product quality review

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

Two envelopes for a cleanroom HVAC tender

Score the technical envelope of a cleanroom HVAC tender and sign it off before any price is opened. Issue the scoring sheet with the tender: mandatory items pass or fail, the rest weighted, for example 40% technical depth and 20% each for documentation, delivery and service. Score every listed deviation.

InsightRead

Scale-up is more than a bigger batch size

Five times the batch at the same set-points gives different granules, because some parameters depend on scale. WHO's technology transfer guideline says batch sizes should be compared and the impact assessed where they differ. Compare the equipment, check dust, exhaust and water at the new scale, and settle set-points with trial batches.

InsightRead