An E12 filter is sometimes sold as "HEPA". EN 1822 puts it in a different group, with a different test behind the label.
The standard sorts high-efficiency filters into three groups. Group E is EPA, efficient particulate air filters, in classes E10, E11 and E12. Group H is HEPA, H13 and H14. Group U is ULPA. At the most penetrating particle size the minimum integral efficiencies are 85% for E10, 95% for E11 and 99.5% for E12, then 99.95% for H13 and 99.995% for H14.
The larger difference is how each filter earns its class. In EN 1822-1:2019, filters of groups H and U shall be individually tested for absence of leaks. For group E the efficiency is determined on a statistical basis, and the standard states that group E filters cannot and shall not be leak tested for classification purposes.
An E12 therefore arrives with a type efficiency and no scan of its own.
That suits some jobs well: a pre-stage that protects the terminal HEPA, or the last stage for a space with no classification to prove. As the terminal filter of a graded room it brings no factory leak test.
Topics




