A fixed-speed fan filter unit delivers less air every month its HEPA filter loads, and nothing on the ceiling shows it.
The fan runs at one speed and settles where its curve crosses the resistance of the filter. As the filter collects dust its pressure drop rises, commonly toward about twice the clean value before it is changed, and the operating point slides back along the curve. How much airflow goes depends on the shape of the fan curve; on a flat curve it can be a large share.
Set an FFU at 0.45 m/s over a Grade A zone and it has 20% to lose before it reaches 0.36 m/s, the bottom of the Annex 1 guidance range of 0.36–0.54 m/s. A fixed-speed unit can spend that margin in the filter's first years without anyone touching it, and the next requalification is where it shows.
A constant-airflow EC unit measures its flow, or works it out from speed and power, and raises the speed as the filter loads. The velocity stays where OQ left it. Two conditions come with it. The unit has to be selected to reach the design airflow at the final pressure drop with speed to spare. And its speed or power has to reach the BMS, where the trend becomes the filter-loading record a fixed-speed unit never had.
AeroSano FFUs are engineered from the project's airflow schedule and FAT-witnessed like every other unit.
Industries




