15 to 25 °C sounds like room temperature. In a delivery van in Viet Nam, it is a refrigeration duty.
Insulation slows heat gain. It does not remove heat. A well-insulated cargo box on a hot route still warms up, only more slowly, and every door opening at a delivery stop admits warm air. On a multi-drop route through Ho Chi Minh City in the hottest months, a controlled-ambient vehicle without active cooling is relying on luck.
What a 15–25 °C vehicle needs:
- A refrigeration unit sized for worst-case heat gain plus door openings, not for an average day.
- Temperature mapping of the loaded cargo space in the hottest season, to find the warm spots and place the probes there.
- Continuous monitoring with calibrated loggers and alarms, and a record that can be handed over for each shipment.
- A written response for a temperature excursion, agreed before the first one happens.
This is the same logic as the 2–8 °C cold chain, applied to a band people wrongly assume is easy. EU GDP expects the required storage conditions to be maintained during transport. In this climate, for 15–25 °C, that means active cooling.
Which month does your vehicle mapping protocol treat as the worst case?
Industries




