2.5 Pa is the minimum negative pressure for an airborne infection isolation room.
The direction of airflow decides who is being protected, and the rooms most hospitals need point in different directions:
- Operating theatres run positive to the corridor, so air leaves the sterile field rather than arriving at it.
- Airborne infection isolation rooms run negative, usually through an anteroom, so contaminated air stays in and leaves by exhaust. ASHRAE 170 sets at least 2.5 Pa negative and 12 air changes per hour.
- Protective environment rooms for immunocompromised patients run positive: the opposite of isolation.
- Sterile compounding pharmacies follow pharmaceutical logic. The buffer room runs positive, unless hazardous drugs are compounded, in which case it runs negative.
The common failure is drift, not design. A door propped open, a damper that has lost its setting, an exhaust fan belt slipping. The room still looks like an isolation room while the air goes the wrong way.
Continuous differential pressure monitoring with a local alarm at the door costs little next to what it prevents.
We engineer pressurisation in hospital clean zones as infection control.
Industries




