A low-pressure UV-C lamp in a pass box emits at 254 nm, and it only doses the surfaces it can see.
Dose is irradiance at the surface multiplied by time. At 0.1 mW/cm² on the tray, a 10-minute hold delivers 60 mJ/cm². Move the item further from the tube and irradiance falls. Put it in shadow and the dose is zero: the underside of a tray, the folds of a bag, the gap under a bottle cap, the far side of a carton. Dust and film on a surface absorb it.
The tube ages too. Standard low-pressure tubes are often rated around 9,000 hours, and output drops across that life well before the glass looks dimmer. A lamp that met its irradiance at installation can be short of it two years later.
Some transfer SOPs still read as if switching the lamp on replaces the wipe. The disinfectant wipe reaches every surface the operator handles, with a contact time validated for that agent, and the transfer depends on it.
The lamp can add a dose to exposed surfaces during the interlocked hold and treat the empty chamber between transfers. For that to count, manage it as a device: an hour meter, a replacement interval, a periodic irradiance check with a UV-C meter at the tray position, and a hold time in the SOP worked out from the measured irradiance.
We supply pass boxes built by qualified partners under our engineering control, each one FAT-tested against the project specification.
Topics



