When a supply AHU trips and extract keeps running, a Grade B room held 10–15 Pa above its neighbour can lose that margin in seconds.
With supply stopped and extract still pulling, the room goes negative and draws air from whatever sits next door, usually the lower grade. Open isolation dampers allow it. Even with every fan stopped, an open path through shared ductwork allows connected rooms to drift toward the same pressure.
For the specification and the control logic, five items cover most of it:
- Tight-shutoff isolation dampers, with the leakage class stated and tested. A volume-control damper asked to double as isolation will not seal.
- A defined fail position for each damper, chosen per application and agreed with the fire and smoke strategy.
- Interlocks that stop return and exhaust with the supply, in the right order, with dampers closing faster than the fans run down.
- Position proven by end switches, so the BMS records that the damper closed instead of inferring it from the command.
- A restart sequence that brings supply up before exhaust, with the room pressure alarm delayed only as long as the sequence needs.
Each item can be tested at FAT on the control panel and again at commissioning, with a deliberate supply fan trip and a pressure logger running in the room.