A microbiology lab has to protect some samples from the room and protect the room from some cultures. One pressure direction cannot do both.
Walk the lab zone by zone and the direction for each one falls out:
- Sample receipt: neutral or slightly positive to the corridor; samples arrive bagged.
- Media preparation: positive. The plates and tubes are open here, and the result will later be read from them.
- Sterility testing: positive and at a higher grade than its surroundings, usually inside an isolator or a unidirectional airflow cabinet.
- Positive control and culture handling: negative to its anteroom, contained, with its own exhaust rather than air returned to the shared AHU.
Annex 1 guidance asks for at least 10 Pa between graded rooms, and 10 to 15 Pa per step is typical. A positive-control room is often ungraded, so there that figure is practice only.
The mistake we see most is a door that opens straight from a positive room into a negative one. With the door shut, both rooms hold their pressure. Open it and the difference collapses, and air mixes both ways through the opening as people and trolleys pass. That is how culture aerosol reaches the media side. An airlock between them keeps one door shut at all times.
Model a door propped open for a trolley during design too; found first in OQ, it usually means changing doors or dampers.
Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)
Industries




