At minimum fan speed with one door propped open, an AHU keeps every room above its low-pressure alarm limit. That is an OQ result.
Results like it still turn up filed under PQ.
OQ shows the system operates as intended across its range, worst-case settings and alarm limits included. PQ shows it performs under normal operating conditions, with production running or a representative simulation, over a period long enough to show the rooms hold their conditions. A test at the limits says nothing about weeks of real shifts, gowning traffic and ordinary door use.
One check we apply when reading a protocol: if a step asks someone to force a condition, such as a fan turned down to minimum, a door held open or a setpoint pushed toward an alarm, it usually belongs in OQ, even when the result looks like good performance data.
With separate protocols, OQ can be closed and approved before the PQ period starts, which is the order the V-model assumes: URS, DQ, IQ, OQ, PQ.
Humiley writes the URS, validation strategy and qualification roadmap in parallel with the design.



