Adjust an out-of-tolerance transmitter and close the work order, and nobody asks how long it was wrong or what was decided on its readings.
Say a room pressure transmitter reads 3 Pa high at its annual calibration, against a ±1 Pa tolerance. For up to twelve months, a room displayed at 12 Pa may have been at 9 Pa. The adjustment is step five:
- Record the as-found values and tag the instrument. Nothing is adjusted yet.
- Find the last calibration that passed. That date opens the window in which the readings are in doubt.
- List what relied on the instrument since then: batches made in the room, alarms that stayed silent, a requalification that used its trend.
- Raise a deviation and have QA assess the impact. Direction matters: a transmitter reading high hid low pressure, while one reading low mostly caused false alarms.
- Adjust or replace, record the as-left values, then review the interval.
EU GMP Chapter 3 says measuring and control equipment should be calibrated and checked at defined intervals, with adequate records. 21 CFR 211.68 says automatic, mechanical and electronic equipment shall be routinely calibrated, inspected or checked according to a written program. Both stop there. For APIs, ICH Q7 adds the look-back: calibration deviations on critical instruments should be investigated for impact on what was made since the last successful calibration.
What does your calibration procedure put between as-found and adjust?