Skip to content

News

Passive or active harmonic filter for an EC fan wall

  • News
  • 1 min read

A passive harmonic filter tuned for full load can turn into a capacitor bank at 3 a.m., when the fan wall is at part speed.

EC fan walls draw current through 6-pulse rectifiers, so the 5th, 7th, 11th and 13th harmonics are always there. With DC chokes THDi sits around 35–42%; without them, 65–75%. Our design target is THDi ≤ 5% at the point of common coupling. IEEE 519-2022 itself sets current-distortion (TDD) limits that depend on the site's short-circuit ratio, and Circular 05/2025/TT-BCT applies in Viet Nam.

A passive LC filter is cheap and simple. It is tuned to one order, usually near the 5th. At light load the harmonic current it was built to absorb falls away, but its capacitive kvar stays, so the power factor goes leading. It can also resonate with the network, and the tuning point moves when the transformer or the other loads change.

An active harmonic filter measures the load current and injects the opposite. It is sized in amps and follows the load down. In our sizing note, a 4 × 4 kW fan wall draws about 27.2 A fundamental and gets one 25 A module. At 8 × 4 kW, two 25 A modules share the work, master and slave.

A cleanroom fan wall spends most of its hours below design speed. That profile favours the active filter, even though it costs more on day one.

Related

More on this subject

Same grade, different room

Grade D sets the particle limit and little else. In an OSD compression room the product is the contaminant, handled with a pressure sink and local exhaust; a semi-solids room has little dust but heat and water from vessels and washdown. Fill in the process loads on the room data sheet before copying any airflow.

InsightRead