An EMS account belonging to someone who left the company last year can still change an alarm limit.
Individual logins fix attributability on go-live day. Over the years that follow, people change shifts, change jobs, cover for each other and leave, and the user list drifts away from the organization chart. Annex 11 expects the creation, change and cancellation of access rights to be recorded. A periodic access review is how a site shows those records still match the people.
On a SCADA or EMS the review can be short:
- Export the user list with roles straight from the system, not from a spreadsheet someone maintains.
- Compare it with HR's leavers and movers since the last review. A leaver still active is disabled at once and raised as a deviation.
- Check each role against the job. An operator rarely needs to edit alarm limits, and a vendor engineer's account can stay disabled between visits.
- Look hard at generic and administrator accounts. Each needs a named owner and a reason to exist.
- Sign and date it, listing the corrections. An inspector will ask for the last two reviews and the records that closed their findings.
Risk sets the interval. A system with frequent staff changes, or remote vendor access, needs a shorter one.
Humiley designs automation and SCADA to 21 CFR Part 11 and Annex 11, and the role definitions are part of that design.
Industries



