Under EU GMP Annex 1 (2022), people who work in Grade A/B areas are qualified for gowning at the start and reassessed at least once a year.
When the same operators fail that reassessment more than once, the usual response is retraining. Sometimes that is the right call. Before booking it, look at where the contamination turned up on the gown, then walk the change room with the gowning SOP in your hand. These are the things we check first:
- Is there a clear line, bench or step-over, between the dirty side and the clean side, and can you gown without crossing back over it?
- Is there space to put on coverall legs without them touching the floor or the wall?
- Are the hand wash, mirror and glove station in the order of the SOP, or does the operator have to walk back across the room?
- Is the final stage of the change room, at rest, the same grade as the room it leads into, as Annex 1 expects?
If the plates keep showing contamination on the lower legs and the step-over bench is too short to sit on, a training session will not lengthen the bench. Moving a bench or a glove station is often a small change control. On a new facility, the gowning sequence can be drawn onto the layout before the walls are fixed.
Industries



