Skip to content

News

Self-check a drawing before it goes for review

  • News
  • 1 min read

Twenty minutes into a drawing review, the lead engineer is still correcting the revision letter and the units.

That time was meant for the questions only experience answers: whether the return grille is on the right side of the room for the process, whether the duct route will survive coordination with the cable trays. A drawing that arrives with a wrong title block, mismatched tags and no calculation turns the review into proofreading.

Before pressing send, go through the sheet yourself.

  1. Title block. Drawing number, revision, date and status are the ones in the drawing register.
  2. Design basis. The notes name the documents the drawing was made from, with their revisions: URS, room data sheets, calculation.
  3. Tags and units. Every tag on the sheet exists in the schedule, spelled the same way, and the flows are in the project's units.
  4. Calculation. Each sized item points to a calculation by number and revision, and the calculation is attached.
  5. Your own red-line pass. Print the sheet, mark it up as if someone else had drawn it, correct it, then send.

The references and the attached calculation are where traceability starts. We want every decision traceable from requirement to calculation, drawing and test, and the chain begins on the sheet.

The self-check takes about fifteen minutes. The review that comes back is then about the grille and the duct route.

Related

More on this subject