12.3 Pa on the room pressure display, from a transmitter that is accurate to about ±1 Pa before drift.
The decimal is resolution, in the sense of the metrology vocabulary JCGM 200: the smallest step the display can show, here 0.1 Pa. Whoever configured the BMS point chose it.
Accuracy is a separate property. A low-range transmitter is usually specified as a percentage of its span. Take one ranged −50 to +50 Pa with a stated accuracy of ±1% of span. The span is 100 Pa, so the figure is ±1 Pa at every point of the range, 12.3 included. Drift, temperature effect and mounting position come on top. A steady display is no comfort either: an offset can sit there all day without moving.
The honest reading is "about 12, give or take one". The last digit is still useful for movement. If the display drops from 12.3 to 11.8 when a door opens, the room lost about half a pascal.
It matters when a limit is close. An alarm at 10 Pa with the room at 11.0 looks like a full pascal of margin. With ±1 Pa on the transmitter there may be none.
The calibration certificate settles it. It gives the error found at each test point and the uncertainty of the calibration itself. Set that beside the datasheet accuracy and you know which digit of the display can carry a decision.
Topics




