Ventilating the EtO aeration room

  • Life Sciences
  • 1 min read

A pallet of devices leaves the EtO steriliser still giving off ethylene oxide, and it keeps doing so for hours or days in the aeration room.

That room gets less design attention than the steriliser, yet it is the one operators walk into. Ethylene oxide is classed as a human carcinogen and is flammable from about 3% in air. Its occupational exposure limits are set in parts per million, far below anything a nose can detect.

So the ventilation brief starts from the operator. Air goes through once, with no recirculation back to the room or to any other space, whatever that costs at the chiller. The room is held negative to the corridor so leakage runs inward. Extract is taken low, because EtO vapour is heavier than air, and supply is arranged to sweep across the pallets instead of leaving still pockets between racks. Aeration is often run warm to speed off-gassing, which also raises the release rate.

The exhaust then has to go somewhere acceptable. Emission rules in many markets require abatement, a catalytic oxidiser or a wet scrubber, and the fan and ductwork have to suit the gas.

Fixed EtO detectors at breathing height, tied to door access and alarms, close the loop. Operators should see the room's reading before they open the door.

We write the extract rate and room pressure into the device plant's HVAC design basis next to the steriliser data.

Industries

Related

More on this subject

Zero growth and the HVAC record around a media fill

Annex 1 sets zero growth as the APS target, and any contaminated unit fails it. The environmental side of the investigation starts from viable monitoring, with HVAC and EMS trends as support, so review trends before the fill, confirm logging and clock sync, and agree which HVAC events count as interruptions.

InsightRead

30% of what? Fix the baseline first

An HVAC energy saving is only as good as its baseline. Hold room limits, weather file, production and cleaning schedules and airflow justification identical in both models, and define the baseline system in writing, for example with ASHRAE 90.1 Appendix G, before quoting any percentage.

InsightRead