Skip to content

News

Work it by hand before you trust the program

  • News
  • 1 min read

A selection program will size a cooling coil for any input you give it, including a wrong one.

Take a fresh-air coil in Ho Chi Minh City. Someone who has worked a psychrometric chart by hand knows roughly where the entering air sits on a humid afternoon, and that the leaving dew point sets the coil rather than the leaving dry-bulb. If the program comes back with a coil that looks small for that load, they notice. Someone who has only ever seen the program's output tends to believe it, because it arrives with four decimal places.

Electrical works the same way. A short-circuit study reads differently once you have done a fault calculation on paper.

That is why fundamentals sit inside our engineering training alongside on-the-job work on real project packages, with mentoring by senior leads. The program was designed with lead engineers from the USA. Every engineer then has a skills matrix and an Individual Improvement Plan, a defined path from junior to senior to lead, and a structured review twice a year.

For students, the way in is our 12-month internship.

Graduating in HVAC, electrical or mechanical engineering in Viet Nam?

Careers and the internship program at Humiley

Related

More on this subject

Energy recovery in once-through potent suites

Many potent suites recirculate through safe-change HEPA housings; where the risk assessment rules that out, every cubic metre is tropical outdoor air. Run-around coils recover heat with the airstreams fully separated, wheels open a leakage path, and dedicated fresh-air pre-cooling targets the latent load. Our energy modeling targets a 30% HVAC energy reduction.

InsightRead

Engineering's part of the product quality review

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead