Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

209 articles filed under News.

ALCOA+ on the EMS is a design requirement

Environmental monitoring and BMS data that support GMP decisions must meet ALCOA+. In practice that means individual logins, time-synchronized controllers, an audit trail users cannot disable, alarms acknowledged with name and comment, and tested backups, with GMP-critical parameters separated early onto a validated system.

Read

What crosses an open cleanroom door

A 10–15 Pa differential between grades exists only while the door is shut. Once it opens, door swing, the operator's wake and any temperature difference between rooms drive air both ways. Holding adjacent rooms at the same temperature, keeping door-open time short and interlocking airlocks keep the exchange small.

Read