Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

28 articles tagged #Semiconductor.

Grade C through a fab engineer's eyes

To a semiconductor engineer, Grade C at ISO 8 in operation looks loose. EU GMP Annex 1 adds microbial limits: 100 CFU/m³ in air, 50 per settle plate over 4 hours, 25 per contact plate. Rooms wiped with sporicide need floors and joints a fab never had to clean, and a CCS that ties the choices together.

InsightRead

Air through a 25% open floor panel moves 4 times faster than the downflow above it, and that pressure drop keeps a fab bay's airflow vertical. Use less open area near return chases, solid panels under tools with rebalancing around them, sealed cut-outs, and check with a smoke study after tool install.

InsightRead

Filtration, AMC control, ±2% RH micro-environments and UHP utilities can each drift without an alarm. Designing facility monitoring with them, measuring at the tool, trending utilities and power on one time base and setting alert limits inside action limits, shows drift before the yield report does.

Read