Air passes a 25% open floor panel 4 times faster than the downflow reaching it, and that pressure drop keeps a fab bay's airflow vertical.
In a bay with fan filter units overhead and a perforated raised floor, air comes down, drops through the floor into the subfloor plenum and runs sideways to the return chases at the edge. Left alone it takes the shortest route: panels near the chases pull more, the middle gets less, and the downflow leans towards the walls, carrying particles across the wafer path.
The floor's resistance is the correction. When the drop across the panels is large compared with the pressure differences inside the plenum, every panel passes nearly the same air. The drop rises with the square of hole velocity, so open area is a strong lever. Too open and the plenum decides where the air goes; too closed and hundreds of FFUs work against more pressure all year.
Placement does the rest:
- Lower open area, or panels with dampers, near the return chases.
- Solid panels under tools, with the open area around them rebalanced.
- Utility cut-outs sealed, so they are not the easiest way down.
- Plenum depth checked with the layout; a shallow plenum builds larger pressure differences.
Check it at working height with velocity readings and a smoke study after the tools are in.
Our semiconductor scope covers ISO Class 1–3 cleanrooms, and we supply the FFUs above the floor.
Topics
Industries


