Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

56 articles tagged #Pharmaceutical.

Hospital pressurisation is infection control

Operating theatres run positive, airborne isolation rooms negative (ASHRAE 170: at least 2.5 Pa and 12 air changes per hour), protective environment rooms positive, and hazardous drug compounding rooms negative. The common failure is drift, so continuous pressure monitoring with a local alarm matters.

Read

Engineering Solution & Consultancy

HVAC – The Heart of Cleanrooms

A cleanroom can meet its classification on paper, yet fail GMP expectations if HVAC performance is unstable or poorly aligned with operational reality. Cleanroom performance is often discussed in terms of ISO classes or GMP grades.

InsightRead

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead