Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

130 articles tagged #Validation.

A new pack size on a line that is already qualified

Adding a pack size to a qualified packaging line is a change. Open a change control with a regulatory assessment, check format parts and settings against the qualified range, validate where the range moved, release artwork, codes and master data, then update the packaging instructions, the line clearance checklist and operator training.

InsightRead

Cpk 1.33: a convention, and what the GMP texts say instead

A Cpk of 1.33 puts the nearer specification limit 4 standard deviations from the process mean. It is a statistical convention: EU GMP Annex 15 (2015 text) and the FDA guidance of 2011 recommend statistical tools and name no index. With 10 batches the confidence interval is wide, so report the batch count and the interval.

InsightRead

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

Batch history is not a process validation

Tabulating twenty or thirty past batches was once called retrospective validation. The 2015 text of EU GMP Annex 15 (section 5) says it is no longer an acceptable approach: a traditional process should undergo prospective validation, with concurrent validation only in exceptional circumstances. The batch history belongs in ongoing process verification.

InsightRead

The 2011 text of EU GMP Annex 11 (clause 6) says that where critical data are entered manually there should be an additional check on their accuracy, by a second operator or by validated electronic means. For a BMS or EMS alarm limit, a permitted range on the field and a confirmation step are the practical answer.

InsightRead

Batches of one product run back to back leave more baked-on product, packed fines and microbial growth for the final clean. The 2015 text of EU GMP Annex 15 (clause 10.9) says the maximum length of a campaign, in time and/or number of batches, should be the basis for cleaning validation. Set that maximum and validate after it.

InsightRead

Where to swab in a cleaning validation

The 2015 text of EU GMP Annex 15 (section 10) says the protocol should specify the sampling locations and the rationale for selecting them. Choose swab points where cleaning is most likely to fail: valve seats, gaskets, dead ends and accumulation points, on every product-contact material, each with a defined area and a recovery study.

InsightRead

The four phases of a technology transfer

WHO Technical Report Series 1044, Annex 4, says a technology transfer project may be divided into four phases: initiation, planning, transfer execution, and review and close-out. A project that begins with the first trial batch has skipped the gap analysis, the transfer protocol and the knowledge package, and cannot explain a failed batch.

InsightRead

Scale-up is more than a bigger batch size

Five times the batch at the same set-points gives different granules, because some parameters depend on scale. WHO's technology transfer guideline says batch sizes should be compared and the impact assessed where they differ. Compare the equipment, check dust, exhaust and water at the new scale, and settle set-points with trial batches.

InsightRead

Choosing the worst-case product for cleaning validation

The 2015 text of EU GMP Annex 15 allows a worst-case product approach to cleaning validation if a scientific rationale is provided; criteria may include solubility, cleanability, toxicity and potency. Put them in a table per product, with the PDE and the residue load, and reopen it when a new product arrives.

InsightRead

Metadata: what a stored value needs to mean anything

A stored value of 22.4 means nothing without its sensor tag, unit, time stamp, status flag, author and audit trail. The MHRA's 2018 data integrity guidance defines metadata as data that describe the attributes of other data and provide context and meaning. Test that backups, exports and migrations carry them.

InsightRead