Skip to content

Life Sciences

Environmental monitoring locations and their rationale

  • Life Sciences
  • 1 min read

Many EM programs still put settle plates on the ISO 14644-1 classification grid, which spreads sampling points evenly by floor area.

Monitoring should go where contamination would reach an open product or a critical surface first. Annex 1 (2022) asks for monitoring locations to come from a documented risk assessment, and the smoke study is one of the best inputs to it.

Five criteria for placing particle counter probes and settle plates:

  1. Airflow pattern. The smoke study video shows where first air meets the product and where it turns. Probes sit on the path to the open containers.
  2. Interventions. Plates go where gloves, tools and operators enter Grade A during routine and corrective interventions.
  3. Proximity without interference. Close enough to represent the critical zone, without disturbing unidirectional flow or the operator's reach.
  4. Worst case in the background room. Near doors, transfer hatches and returns, where the room recovers last.
  5. Evidence. Each location on the drawing carries a reference to the smoke study frame, risk assessment line or intervention that put it there.

Airflow visualization is part of the cleanroom qualification Humiley carries out. If a smoke study is still to come, film it with the EM plan in mind, so a probe location can cite the frame showing first air at the filling needles.

Which of your current EM points would be hardest to explain to an inspector?

Industries

Related

More on this subject

How to qualify a cleanroom testing contractor

Cleanroom testing is often bought late and on price, and QA first meets the tester as a signature on a report. Before the order, hold evidence of tester training, calibrated instruments, method statements to ISO 14644-1 and ISO 14644-3, a sample report and agreed raw data practice, then list the tester as an approved supplier.

InsightRead

HVAC changes and the repeat media fill

EU GMP Annex 1 (2022) lists significant modification to the HVAC system among the reasons to repeat an aseptic process simulation. Changes to airflow pattern, pressure regime or filter housings in aseptic areas should reach QA with an engineering note before the work, and the requalification should be planned with the shutdown.

InsightRead