The engineer who knew why the granulator runs at that impeller speed retired last year. The batch record still gives the number.
When a tech transfer team asks whether the receiving site's granulator can run slower, nobody at the sending site can say what would break.
ICH Q10 names two enablers for the pharmaceutical quality system: knowledge management and quality risk management. Knowledge management gets a short section (1.6.1) and a one-sentence definition: a systematic approach to acquiring, analysing, storing and disseminating information related to products, manufacturing processes and components.
Its sources include development studies, technology transfer activities, process validation, manufacturing experience and change management.
On most sites the files exist. The weak point is the link from a parameter to the study or the change that set it, kept where a successor will look. On the engineering side we keep one design basis behind the drawing, the factory acceptance test and the maintenance task list five years later, so a setpoint can be traced back to it.
For a technology transfer that changes the package. The receiving site needs the master batch record, and it needs the reasons too: which parameters were explored and which were inherited, what failed in development, which change moved a limit.
Where does your site keep the "why" for a process parameter?
Industries




