Checking a screenshot before it becomes test evidence

  • Life Sciences
  • 1 min read

A screenshot with no date, no tag and no user name proves very little.

It gets attached to an OQ step anyway, the step is marked "pass", and two years later a reviewer or an inspector is asked to trust a picture of a number. Look at each attachment the way that reviewer will, while the test can still be run again.

  1. The image shows what was tested and when: system, tag, date, time and the logged-in user.
  2. It is legible and carries a unique reference, for example protocol number, test step and attachment number.
  3. The test step cites that reference, so the link works in both directions.
  4. The tester has signed and dated it.
  5. The raw data behind it is retained: the trend export or the instrument printout the value came from.

These are the ALCOA+ attributes applied to one sheet: who, when, readable, and traceable to the original data. EU GMP Annex 15 (2015) says appropriate checks should be built into qualification and validation work so that the integrity of all data obtained is assured, and the 2011 text of Chapter 4 counts raw data as part of the record.

One habit covers most of the list. Capture the whole screen, with the clock and the user name in it, and never crop.

Industries

Related

More on this subject

Cleaning validation does not follow the SKU count

Cleaning validation follows the residue and the equipment train. SKUs that differ only in pack share one bulk product, and EU GMP Annex 15 allows a justified worst-case product across a group. Changes between SKUs on the packaging line are controlled by line clearance under Chapter 5.

InsightRead

Cleaning validation: five steps, and sampling is the fourth

Sampling is the fourth step of a cleaning validation. Before any swab, EU GMP Annex 15 (2015 text) expects a justified worst-case product, a carryover limit based on a toxicological evaluation, and sampling locations with recovery shown for each surface and method. Hold times belong to the run, and manual cleaning should be confirmed at a justified frequency.

InsightRead

Five points of EU GMP Annex 15 (2015) shape a cleaning validation protocol: all product contact equipment, residue limits based on a toxicological evaluation, dirty and clean hold times, dedicated equipment or other appropriate measures where cleaning is ineffective, and manual cleaning confirmed at a justified frequency. All five are written with 'should'.

InsightRead