Module 1 of the CTD is not common, and ICH's own diagram labels it "not part of the CTD".
ICH M4 says Module 1 is region specific: application forms, the proposed label, whatever each authority specifies. Modules 2 to 5 are intended to be common for all regions, and common refers to the format: M4 states that it is not intended to indicate what studies are required.
A dossier written for one region travels less well than the name suggests. The ASEAN format is the ACTD: the same kind of content in four parts where the CTD has five modules, with quality as Part II. Inside the quality module, M4Q(R1) keeps a regional section, 3.2.R, with examples marked by region: executed batch records for the USA, a process validation scheme for the EU. Stability is the difference that costs time. The ASEAN stability guideline gives 30 °C/75% RH, Zone IVb, as the general long-term condition for the region. Studies run at another condition for a first market may not support a hot and very humid one, and no amount of writing produces long-term data from a chamber that was set differently.
This is why we ask for the destination market to be fixed in the design basis on day one.
Industries



