At 02:10 a differential pressure alarm does its job: it appears on a screen in an empty control room.
The room stays out of limits until the morning shift reads the banner. The sensor, the limit and the delay have all been qualified. Nobody has tested the path from the alarm to a person.
That path has several links, and each can be checked with a stopwatch and a phone:
- Every route delivers. Trigger one test alarm and confirm it arrives on the screen, at the local sounder and beacon, and as an SMS or e-mail, each one separately.
- The time from event to receipt is measured and recorded. A message that arrives after twenty minutes is a different control from one that arrives in one.
- Escalation works when nobody acknowledges: the second and third contacts receive the alarm after the stated time.
- The out-of-hours contact list is current. Call every number on it.
- The system reports when the message service is down. An expired SIM, a blocked mail relay or a failed gateway raises its own alarm.
A dead message route makes no noise, so it gets a scheduled test message at a fixed hour that someone expects to receive.
These are functions like any other in the URS and the functional specification. They belong in OQ with a pass criterion in minutes, and in the periodic review afterwards, because phone numbers change faster than setpoints.
Topics




