Grade A is judged in operation

  • Manufacturing & Distribution
  • 1 min read

Grade A allows 3,520 particles of 0.5 µm or larger per cubic metre, and the limit does not relax when the operators walk in.

That is what shapes the equipment. Grade B is ISO 5 at rest but ISO 7 in operation. Grade A is ISO 5 in both states. So an FFU array over a filling line is not judged in an empty, freshly cleaned room. It is judged with gowned arms over the stopper bowl, a machine running and a door cycling nearby.

Under those conditions the array has to deliver four things:

  1. Uniform unidirectional flow across the whole critical zone, including the joints between modules. Annex 1 (2022) gives 0.36–0.54 m/s at a defined working position as a guidance value.
  2. H14 filters that pass an installed leak scan, in housings built so the scan is possible.
  3. A smoke study run in operation with the real interventions, showing the air sweeping particles away from open product instead of rolling back under an arm.
  4. Fan speed control that holds velocity as the filters load.

A common pattern at qualification: the particle counts pass at rest, then the smoke video shows turbulence exactly where the operator reaches in.

AeroSano FFUs and HEPA housings are built from the project's airflow schedule and FAT-tested before they ship.

Industries

Related

More on this subject

Annex 1 has applied since 25 August 2023

The revised EU GMP Annex 1 has applied since 25 August 2023, with point 8.123 following in 2024. A site still planning its gap assessment is years behind. Most findings land in the CCS, for example a pressure alarm delay set at commissioning that nobody can justify.

InsightRead

Both states are required; only the stage is a choice

A 50 m² Grade B room needs 10 classification locations under ISO 14644-1:2015, and EU GMP Annex 1 requires them at rest against ISO 5 and in operation against ISO 7, with the smoke study in both states. Whether each run sits in OQ or PQ is for the URS and risk assessment to justify.

InsightRead

Central Vacuum Cleaning

In GMP audits, scrutiny often lands on Cleaning Procedures. Using portable vacuum cleaners in cleanrooms is a red flag. Why? Because the exhaust turbulence from a portable unit disrupts laminar airflow and can aerosolize settled dust,…

InsightRead