Grade B at rest: state the equipment condition

  • Life Sciences
  • 1 min read

Grade B at rest allows 29 particles of 5 µm and larger per m³. In operation the same room may hold 2,930.

At 0.5 µm the step is the same factor of 100: 3,520 per m³ at rest, equal to the Grade A limit at that size, against 352,000 in operation. For a RABS background room the at-rest figure is the one the design has to beat.

ISO 14644-1 leaves the at-rest equipment condition to agreement between customer and supplier. For GMP grades, Annex 1 (2022) is more specific: utilities complete with the HVAC running, the main manufacturing equipment installed as specified and standing by for operation, and no personnel present. The at-rest limits should be met after a short clean-up period following operations, with a guidance value of under 20 minutes.

That rules out some convenient set-ups. A room classified with the line isolated and its RABS fans switched off is not at rest in the Annex 1 sense. A reading taken an hour after the operators left shows the room at its cleanest, not that it gets there within the clean-up period.

The 5 µm channel shows the difference first. If that count sits near 29 with the line on standby, it is better found at qualification than after the first media fill.

The protocol should state the equipment condition and the time since the last person left. Commissioning and qualification are part of Humiley's project management work.

Industries

Related

More on this subject

Two envelopes for a cleanroom HVAC tender

Score the technical envelope of a cleanroom HVAC tender and sign it off before any price is opened. Issue the scoring sheet with the tender: mandatory items pass or fail, the rest weighted, for example 40% technical depth and 20% each for documentation, delivery and service. Score every listed deviation.

InsightRead

The PIC/S GMP Guide and EU GMP are almost identical, revised Annex 1 included. In the EU the GMP principles are set in law and certificates sit in EudraGMDP; PIC/S authorities adopt the guide nationally and PIC/S certifies nothing. One design serves both; the EU inspection route is planned separately.

InsightRead

Recovery test or clean-up period in the URS

The ISO 14644-3 recovery test times a 100:1 fall in particle concentration after an aerosol challenge and measures the air system. The Annex 1 clean-up period, under 20 minutes as a guidance value and set during qualification, describes the room after real operations. Write the recovery test into the URS and set the clean-up period at in-operation qualification.

InsightRead