Skip to content

Life Sciences

Grade A particle monitoring: probe, tubing and timestamps

  • Life Sciences
  • 1 min read

Refilling the stopper bowl is a short intervention, and a counter that samples Grade A for one minute in every hour will usually miss it.

EU GMP Annex 1 (2022) closes that gap. Grade A is to be monitored continuously for particles ≥ 0.5 µm and ≥ 5 µm for the whole of critical processing, equipment assembly included, at a sample flow of at least 28 litres per minute. The data is there to catch interventions, transient events and slow deterioration of the system.

Most of the design follows from that requirement, starting with the probe. It goes next to the open product and the fill needles, even when that makes the sample tube take a longer route out through the RABS or isolator. A probe placed where the tube was easy to run measures air the product never meets.

Particles of 5 µm and larger are lost in long, bent sample tubes, so keep the tube as short as the probe position allows.

For an investigation, the counter clock has to agree with the clock on the batch record, or a spike cannot be placed next to the intervention that caused it.

Put the probe on the layout before the barrier is ordered. Moving it later can mean a new port through the barrier and a change control.

Industries

Related

More on this subject

WFI belongs in the Contamination Control Strategy

EU GMP Annex 1 (2022) gives WFI circulation above 70 °C as an example of minimizing the risk of microbial growth. Keeping a loop hot drives the design: ASME BPE dead legs of L/D ≤ 2, turbulent flow to the last user point, planned sanitization and sensors on the return. The CCS should justify all of it.

InsightRead

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead