Chapter for chapter, the PIC/S GMP Guide matches EU GMP almost word for word, and the revised Annex 1 is in both.
What differs is who can act on an inspection, and for an export plan that decides the route to market.
In the EU, the GMP principles are set in law through EU directives, and the EudraLex Volume 4 guide is how inspectors apply them. Member-state authorities inspect, and the GMP certificates they issue go into the EudraGMDP database, where an EU importer and its QP can check them.
PIC/S is a co-operation between inspectorates. Each participating authority adopts the guide (PE 009) into its own national rules and inspects against it. PIC/S itself does not inspect plants and issues no certificates.
A plant inspected by a PIC/S authority has been measured against the same text, which makes an EU inspection easier to prepare for. It still has no EU GMP certificate. For supply into the EU, the site needs an inspection by an EU authority, or by an authority covered by a mutual recognition agreement with the EU for that product type.
On the engineering side, one design to the harmonised text serves both, and the building, HVAC and qualification evidence stay the same. The inspection route is a separate plan that needs a date and an owner before the design basis is signed.
Our EU-GMP roadmap work covers that route: QMS, dossier, technology transfer, MAH and QP arrangements.
Industries




