Skip to content

Life Sciences

Name the particle size with the ISO class

  • Life Sciences
  • 1 min read

ISO 7 has a class limit at only 3 of the 6 particle sizes in ISO 14644-1: 0.5, 1 and 5 µm.

The table runs from ≥0.1 µm to ≥5 µm, and some cells are blank on purpose. ISO 5 has no ≥5 µm limit, because counts that low are not statistically usable at practical sample volumes. ISO 7 and ISO 8 have nothing below 0.5 µm, because concentrations there would be too high to count meaningfully.

What remains, per cubic metre:

ISO 5: 10,200 at ≥0.3 µm, 3,520 at ≥0.5 µm, 832 at ≥1 µm

ISO 7: 352,000 at ≥0.5 µm, 83,200 at ≥1 µm, 2,930 at ≥5 µm

ISO 8: 3,520,000 at ≥0.5 µm, 832,000 at ≥1 µm, 29,300 at ≥5 µm

The standard expects a class to be stated with its occupancy state and the particle size or sizes considered. A URS that says "ISO 7" and stops hands that choice to whoever writes the protocol. GMP grades are classified at ≥0.5 µm, and at ≥5 µm where Annex 1 sets a limit. A device assembly room may care most about ≥0.3 µm, which ISO 7 does not cover, so it needs a different class or a site limit. Counter channels, sample volume and pass or fail all follow.

On Humiley projects the URS is written alongside the design, which is the time to fix the counting sizes.

Industries

Related

More on this subject

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead

EU GMP Chapter 3 and 21 CFR 211 on HVAC

21 CFR 211.42 and 211.46 and EU GMP Chapter 3 ask for adequate ventilation, air control and filtration, but give no air change rate or pressure differential, and no filter class beyond HEPA for aseptic areas. Those come from Annex 1, FDA's 2004 aseptic guidance, ISO 14644 and the designer's justification, recorded in the design basis.

InsightRead

Grade B at rest: state the equipment condition

Grade B at rest is held to 3,520 particles ≥0.5 µm and 29 ≥5 µm per m³. Annex 1 (2022) defines at rest for GMP grades as HVAC running, main equipment installed and standing by, and no personnel, reached after a clean-up period of under 20 minutes as guidance. The protocol should record that condition.

InsightRead