Seven checks before you sign a HEPA leak test report

  • News
  • 1 min read

The inspector never saw your HEPA scan. They read the report, and the report is where installed leak tests quietly fail.

A test can be done well and recorded badly. Before you sign, check seven lines:

  1. Upstream concentration measured and written down, not assumed. With a photometer, a leak is a reading above 0.01% of it, so without that number the result has no reference.
  2. Challenge uniformity across the filter face. A poorly mixed challenge makes half the filter look better than it is.
  3. Probe size and scan rate recorded, and matching the calculation in the protocol.
  4. Overlapping strokes. Gaps between passes are untested media.
  5. The frame-to-housing seal scanned, not only the media. The gasket is a leak path a media-only scan never sees.
  6. Instrument calibration in date on the day of the test, with certificate numbers.
  7. Filter serial numbers matched to the drawing positions, so a repair or a replacement can be traced to the right filter.

Items 5 and 7 are the ones most often missing. A report that says "all filters passed" without saying which filters, where, is a report you cannot defend.

Periodic requalification is part of our Maintenance Service, and this list is how we read the reports before they go to QA.

Which of the seven does your current contractor leave out?

Related

More on this subject

Three APS runs across all shifts, and the HVAC has to hold still

Annex 1 initial validation of an aseptic process needs at least 3 consecutive successful simulations covering all working shifts, then periodic runs twice a year per process, line and shift. The cleanroom must hold its qualified state throughout. Agree an HVAC freeze date with QA, and list in advance which jobs are like-for-like and which need an impact assessment.

InsightRead

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead

Bag-in/bag-out: a contained filter change

In a potent-compound suite the exhaust HEPA collects the compound for its whole life. A bag-in/bag-out housing needs gas-tight isolation dampers, a bag change in which the ring never opens to the room, ports for in-place leak testing and space to work the bag, plus a written procedure and trained technicians.

InsightRead