Skip to content

Life Sciences

Transport verification lives in Annex 15

  • Life Sciences
  • 1 min read

EU GMP Annex 15 is usually read as the plant's qualification annex, yet its transport section asks for verification route by route.

It covers finished medicinal products, investigational products and samples. They should travel in the conditions set in the marketing authorisation or the product specification, and the verification should consider variable factors such as seasonal variation. For a manufacturer shipping to its own distributors, that puts the lanes inside the validation program, next to the equipment qualification.

Most of the verification plan is predictable: each lane including the cross-dock and the overnight stop, full and part loads, the hot and the wet months, and vehicles qualified for 2–8 °C or 15–25 °C with realistic door-open times.

The gap tends to open at the data logger. A common arrangement: the dispatching warehouse starts the logger, the receiving site downloads it and files the PDF with the delivery note, and nobody on either side compares the trace with the limits before the stock is released. An excursion during the overnight stop then surfaces weeks later, in a trend review or a complaint investigation.

The fix is an owner written into the procedure. One named role, at a named site, downloads each logger within a stated time of delivery, checks the trace against the limits, and has the authority to hold the stock until that is done.

More on our news page

Industries

Related

More on this subject

A vendor IQ/OQ protocol and the URS lines it leaves out

A supplier's standard IQ/OQ protocol was written for the standard machine, before your URS existed. EU GMP Annex 15 (2015) says site personnel should confirm its suitability before approval, and that vendor protocols may be supplemented. Trace each URS line to a test, then write a short supplementary protocol for the lines left uncovered.

InsightRead