A patient leaflet gains one new warning, and for three months two versions of it sit on the same pallet rack.
In the store the two stacks look the same: one item code, one product name, one supplier label. The only difference is a line of text on the inside of a folded sheet, and the picker has no way to see it.
The usual cause is that the artwork was never given a version of its own. When the text changed, the code stayed, so the warehouse system sees one material where there are two.
EU GMP Chapter 5 is brief on what happens next: outdated or obsolete printed packaging material should be destroyed and this disposal recorded (clause 5.48).
Destroying the right stack means being able to tell the stacks apart. In practice every printed component carries a version code that a person or a reader can see. On the day the new version becomes effective, the old stock goes to quarantine and is then destroyed with a record. At line start, the code on the component is checked against the packaging instructions for the batch.
The awkward part is the date. Regulatory affairs knows when the new text must be in use, and the warehouse knows what is still on the shelf. On most sites the document that joins the two is the artwork change record, and it needs a line for remaining stock of the old version.
Topics
Industries




