Skip to content

News

Why a lower setpoint makes a humid room read wetter

  • News
  • 1 min read

Turn a room at 24 °C and 55% RH down to 22 °C with the same water in the air, and it reads about 62% RH.

The room feels sticky, so someone lowers the setpoint by 2 °C. An hour later the humidity alarm is closer than before. Nothing is broken. Relative humidity is the water vapour in the air as a share of what air at that temperature could hold, and cooler air holds less. The dew point in this example stays near 14.4 °C throughout, so no water has left the room.

What happens next depends on how the air handling unit is controlled. On a comfort unit where the room thermostat drives the cooling valve, a lower setpoint keeps the coil cold for longer and some extra water does condense. On most cleanroom units the coil is held to an off-coil temperature and a reheater trims the room. There, a lower setpoint only cuts reheat, and the supply air arrives carrying the same moisture as before.

Water leaves the air at a coil surface colder than the air's dew point, or in a desiccant wheel, which adsorbs it. The reading to look at is supply air dew point against room dew point. If the supply is no drier than the room, the unit is taking no water out of it.

Related

More on this subject

Set a device assembly room's class from the product's risk

ISO 13485 §6.4.2 asks for documented contamination control without naming a cleanroom class. Setting the class from sterilisation method, patient contact and bioburden sensitivity often lands device assembly at ISO 8, with ISO 7 only where needed, less air than Grade C, a smaller AHU and a reason an auditor can read.

InsightRead